Projectionists Meeting @ 2020-01-08 13:00:00

Proj Meeting: Term 2, Week 1 2020
Welcome and Apologies
Present: Callum, Alex, Jamie L, Matt R, Elena
In Attendance: Antoinette, Aryan, Josh, Sara
Apologies: Barnaby

Rotas
Little Monsters on 13/1 – filled by Jamie L

Show Reports
Up – 5/1
Q-Proj: Kieran; T-Proj: Liam

Played “Partly Cloudy” Short

The Farewell – 6/1
Q-Proj: Jamie Lok; T-Proj: Barnaby

Jamie enjoyed the film

The Peanut Butter Falcon – 7/1
Q-Proj: Callum; T-Proj: Toby

Nothing to add

Tech Officer’s Report
The projector has been moved
Everything is broken lol
New Speaker drivers + horns!
35mm in disarray. One rectifier is installed, one needs to be moved in and installed
New projector base assembled
New amplifiers
Getting DIRAC2 assessment (?)
Hopefully will have new projector installed by Sat week 3
Shouldn’t need additional training for new interface
Macros will have the same name
Unique digital aren’t deleting things we’ve finished with - Ingest ASAP
Lamp is more flickery - AP thinks it needs focusing
Oil leak may have been fixed

Proj Procedure Changes
Projector comes on with proj power
Slides no longer on slides PC - Same input
Grid is not existent
There is no longer a slides PC - No need to switch mouse anymore with button on the floor
Push P3 AKA P0 on the slide change - Can’t do it during the black, as the slides swap instantly now

AOB
AP Started a discussion about electrical safety
JL reminds Alex and everyone else to learn their power paths
ES Reminds everyone to come to the welcome back start of term social
MR Raises a point about the OV of Doctor Sleep. Kieran says that it’s verifying. It seems to have encountered an error and it re-hashing the whole file
KH reminds everyone to ensure films arrive at least 48HRS in advance, and let him know if they haven’t arrived. There is also a publicity run, please come!
CO adds a reminder to use film tracking
AC invites all present to Meet the Exec Wednesday Week 3 5pm?
Meeting ended at 13:58